Tag: Embossed Knitting Stitches

  • Stitch 23 – Rain Stitch

    Stitch 23 – Rain Stitch

                    Knitted in a multiple of any even number and 4 row repeat. Row 1) Knit the first stitch then repeat:(Insert the needle between the next 2nd and 3rd stitches, Pull the yarn out and keep it in right needle, Knit 2 stitches together) Row 2) Purl all stitches Row 3) Repeat:(Insert the…

  • Stitch 19 – Bobble Stitch

    Stitch 19 – Bobble Stitch

                  Row 1) knit all stitches Row 2) Repeat; k1, (P1, yo, P1, yo, P1) all in the next stitch Row 3) Purl all the stitches Row 4) Repeat; k1, put yarn in front and sl2, P3tog, psso2 Row 5) knit all stitches Row 6) k1, repeat; k1, (P1, yo, P1, yo, P1) all in…

  • Stitch 17 – Diamond Stitch

    Stitch 17 – Diamond Stitch

                    Knitted in any multiple of even number and 16 row repeat Row  1 )  Knit all the stitches Row  2 )  purl 2 first stitches then * pick up 3 stitches without knitting , purl 3 next and repeat from * Row  3 )  Pick up the same stitches without knitting…

  • Pattern 16 – Basic Cable Stitch

    Pattern 16 – Basic Cable Stitch

      Take 2 stitches from left needle to the right needle without knitting them, knit the next 2 stitches, Drop these 4 knits from right needle , Take stitch number 3 & 4 with right needle , Take number 1 & 2 with left needle , knit number 1 & 2 which are in the left needle…

  • Stitch 15 – Hexagonal Stitch

    Stitch 15 – Hexagonal Stitch

                    Made in a multiple of 4 stitches and 8 row repeat.

  • Stitch 10 – Bouble Stitch

    Stitch 10 – Bouble Stitch

                          Row 1) Knit the first row Row 2) Purl all the stitches Row 3) k6 then * change the position of needles P5, again come back and knit the same 5 stitches , repeat this direction up to 3 times for the same 5 stitches. Then…